Generator Requirements
Generator Requirements
Residential Generators
- Permit is required
- Submit a plat of survey indicating the location of
the generator from all four lot lines. Please do not
reduce or submit a partial survey.
- Generator must be located in a buildable area in the
rear yard. (generator may not be located in the front or
side yards.)
- Generator shall not be more than 79 decibels
measured at the lot line. It is suggested that the
generator be screened with plantings, hedges or fence.
- A brochure of specification of the generator must be
submitted with the survey when applying for a permit.
- After the permit is issued and generator installed
electrical and final inspections are required.
- Generator permit fee is $75.00 plus plan review fee.
Comercial Generators
- Permit is required
- Submit a plat of survey indicating the location of
the generator from all four lot lines. Please do not
reduce or submit a partial survey.
- Generator must be located in a buildable area in the
rear yard. (generator may not be located in the front or
side yards.)
- Generator shall not be more than 67 decibels
measured at the lot line. Generator must be screened.
- A brochure of specification of the generator must be
submitted with the survey when applying for a permit.
- After the permit is issued and generator installed
electrical and final inspections are required.
- Generator permit fee is $125.00 plus plan review fee
|
 |
|
|