AGENDA MEMO

City Council

April 16, 2012

 

ISSUE STATEMENT

Approval of a resolution authorizing the Mayor and City Clerk to execute a contract for the 2012 Neighborhood Drainage Program between the City of Darien and Scorpio Construction Corp for the layout and replacement of storm sewer pipes and structures, and grading in an amount not to exceed $50,975.00.

 

RESOLUTION

                                                                                               

BACKGROUND

The proposed FY 12-13 Budget includes funds for the following neighborhood drainage projects:

Poplar Lane – Janet Avenue to Elm Street; and Bentley Avenue – 71st Street to 72nd Street;. Residents adjacent to these projects have requested that the City address standing water in the ditches fronting their residences. The scope of work under the proposed contract would include the removal and replacement of culverts, removal and installation of inlets as required, ditch regrading, and bank stabilization and preparation for landscape restoration. All materials and outsourcing for landscaping, bituminous surface, concrete, testing, trucking and tipping and transfer fees were approved earlier this year under separate agenda memos.

 

Below is a narrative of the projects:

 

Poplar Lane from Janet Avenue to Elm Street. The existing conditions on Poplar Lane within the eastern and western right of way do not allow the conveyance of storm water from Janet Avenue to Elm Street ditches. The proposed project would include the removal and replacement of deteriorated culverts, installation of inlets as required, the enclosure of ditches as necessary, and approximately 1200 lineal feet of ditch regrading.  The project goal is to allow storm water to flow at the optimal level. Poplar Lane is scheduled for a street resurfacing project this year under a separate contract.

 

Bentley Avenue between 71st Street and 72nd Street. The existing conditions within the eastern and western right of way do not allow the conveyance of storm water from 72nd Street to 71st Street ditches.  The proposed project would include the removal and replacement of deteriorated culverts, removal and installation of inlets as required, the enclosure of ditches as necessary, and approximately 1200 lineal feet of ditch regrading. The project goal is to allow storm water to flow from 72nd Street to 71st Street.  Bentley Avenue is scheduled for a street resurfacing project this year under a separate contract.

 

Staff had received five (5) sealed bids on January 20, 2012, see Attachment A. The bid tabulation includes a base bid with alternatives.  Attachment B summarizes the bid costs for the 2012 Neighborhood Drainage Program. 

 

The proposed contract with Scorpio Construction Corp includes the following:

            A.        Field Layout

            B.         Removal and Placement of Deteriorated Pipes

            C.         Removal and Placement of Inlets, Catch Basins and Grates

            D.        Ditch Regrading

 

Scorpio Construction has provided services for the ditching program in 2008, 2010 and 2011 with very satisfactory results. Please see attached pages 5-8, a Cost Summary as it relates to the projects. The vendor will be charging the City an additional $3,500 for mobilization due to the proposed projects being alternates and not part of the base bid. (See e-mail)

 

The proposed expenditure would be from the following account:

 

 

ACCOUNT NUMBER

 

ACCOUNT DESCRIPTION

 

FY 12/13 BUDGET

PROPOSED EXPENDITURE TO SCORPIO

 

TOTAL

PROJECT COST

 

PROPOSED BALANCE

 

25-35-4376

DITCH PROJECTS

$ 884,543.00

$ 50,975.00

$ 223,800.00       

 

$ 660,743.00

 

COMMITTEE RECOMMENDATION

The Municipal Services Committee recommends approval of the proposed contract with Scorpio Construction Corp for Projects - Poplar Lane and Bentley Avenue.

 

ALTERNATE CONSIDERATION

As directed by the City Council.