AGENDA MEMO

City Council

April 5, 2010

 

ISSUE STATEMENT

1          Approval of a resolution authorizing the Mayor and City Clerk to execute a contract for the 2010 neighborhood drainage improvements between the City of Darien and Scorpio Construction Corp in an amount not to exceed $134,600.00.

 

RESOLUTION               BACKUP

 

2          Approval a motion authorizing City Staff to proceed with Projects:

D-09 – Brookbank Road - Janet Avenue to Elm Street                  $128,000

A10 – Evans Place - Janet Avenue to Elm Street                             $110,000

B10 – Richmond Avenue - 67th Street North to City Limits                $73,000

C-10 - Western Avenue - 72nd Street to Plainfield Road                   $173,000

TOTAL---------------------------------------------------------------------   $484,000

 

BACKGROUND

The proposed FY 10-11 Budget includes funds for the following neighborhood drainage projects:

Project D-09 – Brookbank Road Janet Avenue to Elm Street; Project A10 – Evans Place Janet Avenue to Elm Street; Project B10 – Richmond Avenue 67th Street North to City Limits; and Project C-10 - Western Avenue 72nd Street to Plainfield Road. Residents adjacent to these projects have requested that the City address standing water in the ditches fronting their residences. The scope of work under the proposed contract would include the removal and replacement of culverts, removal and installation of inlets as required, ditch regrading, and bank stabilization and preparation for landscape restoration. The materials and various additional contractual services required for the improvements are covered under separate agenda memos.

 

Below is a narrative of the projects:

Project D-09 – Brookbank Road from Janet Avenue to Elm Street. The existing conditions on Brookbank Road within the eastern and western right of way do not allow the conveyance of storm water from Janet Avenue to Elm Street ditches. The proposed project would include the removal and replacement of deteriorated culverts, installation of inlets as required, the enclosure of ditches as necessary, and approximately 800 lineal feet of ditch regrading.  The project goal is to allow storm water to flow at the optimal level.

 

Project A10 Evans Place between Janet Avenue and Elm Street. The existing conditions within the eastern and western right of way do not allow the conveyance of storm water from Janet Avenue to Elm Street ditches.  The proposed project would include the removal and replacement of deteriorated culverts, removal and installation of inlets as required, the enclosure of ditches as necessary, and approximately 900 lineal feet of ditch regrading. The project goal is to allow storm water to flow from Janet Avenue to Elm Street.

 

Project B10 – Richmond Avenue from 67th Street north to City limits.  The existing conditions on Richmond Avenue within the eastern and western right of way do not allow the conveyance of storm water to the 67th Street ditch. The proposed project would include the removal and replacement of deteriorated culverts, installation of inlets as required, the enclosure of ditches as necessary, and approximately 500 lineal feet of ditch regrading.  The project goal is to allow storm water to flow at the optimal level to 67th Street.

 

Project C10 Western Avenue from 72nd Street to Plainfield Road. The existing conditions on Western Avenue within the western and eastern right of way ditch do not allow the conveyance of storm water to flow the southern downstream limits. The proposed project would include the removal and replacement of deteriorated culverts, installation of inlets as required, the enclosure of ditches as necessary, and approximately 1,000 lineal feet of ditch regrading.  The storm water should flow within the ditch lines of Western Avenue.

 

Staff had received thirteen (13) sealed bids on March 24, 2010 as outlined below. The bid tabulation is attached as Attachment A. 

VENDOR

BID RESULTS

Scorpio Construction

$134,600.00

Century Contractors

$137,700.00

Salce Inc

$144,555.00

TBS Construction

$151,010.00

Riccio Construction

$157,795.00

Lenny Hoffman Excavators

$184,254.00

Copenhaver Construction

$215,468.00

Len Cox & Sons Excavating

$218,984.00

Northwest General Contractors

$226,875.00

Northwest General Contractors

(Revised) $159,875.00

Kovilic Construction

$249,150.00

Lifco Construction

$292,717.00

*Hoppe’s Trenching

DISQUALIFIED

*Please note the bid was received without Addendum 1 and therefore was disqualified.

 

The proposed contract with Scorpio Construction Corp includes the following:

            A.        Field Layout

            B.         Removal and Placement of Deteriorated Pipes

            C.         Removal and Placement of Inlets, Catch Basins and Grates

            D.        Ditch Regrading

 

Scorpio Construction has provided services for the ditching program in 2008 with very satisfactory results. Please see attached pages 4-12 is a Cost Summary as it relates to the projects.

 

The proposed expenditure would be from the following account:

 

ACCOUNT NUMBER

ACCOUNT DESCRIPTION

FY 10/11 BUDGET

PROPOSED EXPENDITURE TO SCORPIO

TOTAL

PROJECT COST

PROPOSED BALANCE

 

25-30-4376

DITCH PROJECTS

$548,600.00

$       134,600.00

$484,000.00

 

$64,600.00

 

COMMITTEE RECOMMENDATION

Please note this item is a re-bid contract and due to time constraints was not reviewed by any Committee. This item will be placed under New Business for the April 5, 2010 City Council Meeting.

 

ALTERNATE CONSIDERATION

As directed by the City Council.

DECISION MODE

This item will be placed on the April 5, 2010 City Council agenda for formal approval.