AGENDA MEMO
1 Approval of a resolution authorizing the Mayor and City Clerk to execute a
contract for the 2010 neighborhood drainage improvements between the City of
Darien and Scorpio Construction Corp in an amount not to exceed $134,600.00.
2 Approval
a motion authorizing City Staff to proceed with Projects:
D-09 – Brookbank
Road -
A10 –
B10 –
C-10 - Western Avenue -
TOTAL--------------------------------------------------------------------- $484,000
BACKGROUND
The
proposed FY 10-11 Budget includes funds for the following neighborhood drainage
projects:
Project D-09 – Brookbank Road Janet
Avenue to Elm Street; Project A10 – Evans Place Janet Avenue to Elm Street;
Project B10 – Richmond Avenue 67th Street North to City Limits; and Project
C-10 - Western Avenue 72nd Street to Plainfield Road. Residents adjacent to these
projects have requested that the City address standing water in the ditches
fronting their residences. The scope of
work under the proposed contract would include the removal and replacement of
culverts, removal and installation of inlets as required, ditch regrading, and
bank stabilization and preparation for landscape restoration. The materials and
various additional contractual services required for the improvements are
covered under separate agenda memos.
Below
is a narrative of the projects:
Project D-09 – Brookbank Road from
Project A10 –
Project B10 – Richmond Avenue from
Project C10 –
Staff had received thirteen (13) sealed bids on March
24, 2010 as outlined below. The bid tabulation is attached as Attachment
A.
|
VENDOR |
BID RESULTS |
|
Scorpio Construction |
$134,600.00 |
|
Century Contractors |
$137,700.00 |
|
Salce Inc |
$144,555.00 |
|
TBS Construction |
$151,010.00 |
|
Riccio Construction |
$157,795.00 |
|
Lenny Hoffman Excavators |
$184,254.00 |
|
Copenhaver Construction |
$215,468.00 |
|
Len Cox & Sons Excavating |
$218,984.00 |
|
Northwest General
Contractors |
$226,875.00 |
|
Northwest General
Contractors |
(Revised) $159,875.00 |
|
Kovilic Construction |
$249,150.00 |
|
Lifco Construction |
$292,717.00 |
|
*Hoppe’s
Trenching |
DISQUALIFIED |
*Please note the bid was
received without Addendum 1 and therefore was disqualified.
The proposed contract with Scorpio
Construction Corp includes the following:
A. Field
Layout
B. Removal
and Placement of Deteriorated Pipes
C. Removal
and Placement of Inlets, Catch Basins and Grates
D. Ditch
Regrading
Scorpio Construction has provided services for the
ditching program in 2008 with very satisfactory results. Please see attached
pages 4-12 is a Cost Summary as it relates to the projects.
The
proposed expenditure would be from the following account:
|
ACCOUNT NUMBER |
ACCOUNT DESCRIPTION |
FY 10/11 BUDGET |
PROPOSED EXPENDITURE TO SCORPIO |
TOTAL PROJECT COST |
PROPOSED BALANCE |
|
25-30-4376 |
DITCH PROJECTS |
$548,600.00 |
$ 134,600.00
|
$484,000.00 |
$64,600.00 |
COMMITTEE RECOMMENDATION
Please
note this item is a re-bid contract and due to time constraints was not
reviewed by any Committee. This item will be placed under New Business for the
April 5, 2010 City Council Meeting.
ALTERNATE CONSIDERATION
As
directed by the City Council.
This item will be placed on
the April 5, 2010 City Council agenda for formal approval.