 |
Permit Fee Schedule
Revised 6/3/2010
Permit Fee Schedule
| Residential |
| Air Conditioner Replacement |
$50.00 |
| Deck |
$50.00 + plan review fee |
| Demolition |
$100.00 |
| Driveways |
$75.00 + $175.00 Refundable deposit |
| Electrical service |
$50.00 |
| Fence |
$25.00 |
| Garage (detached) |
$200.00 + plan review fee |
| Generator |
$50.00 + plan review fee |
| Landscaping/Grading |
$50.00 |
| Lawn sprinkler system |
$75.00 + $175.00 Refundable deposit |
| Patio – Cement or Paver brick |
$50.00 |
| Roof |
$50.00 |
| Satellite Dish |
$50.00 |
| Private sidewalk/service walk |
$50.00 |
| Shed |
$50.00 |
| Single Family New Construction |
See Construction Cost Table Below |
| Single Family Addition / Alteration |
See Construction Cost Table Below |
| Swimming Pool (above Ground) |
$75.00 |
| Swimming Pool (in ground) |
$150.00 + plan review fee* |
| Commercial |
| Buildouts/ Alterations / New
Construction |
See Construction Cost Table Below |
| Certificate of Occupancy |
$100.00 |
| Fire Protection Systems |
$50.00 |
| HVAC / Generators |
$150.00 + plan review fee |
| Marquees, Canopies, & Awnings |
$20.00 + $0.20 per sq ft of surface
area |
| Signs (non-illuminated) |
$100.00 + $1.00 per sq ft of gross
surface area + Plan Rev |
| Signs (illuminated) |
$200.00 + $2.00 Per sq ft of gross
surface area + Plan Rev |
| Sign Reface |
$100.00 |
| Temporary Sign |
$35.00 |
The building permit fee for all new construction,
additions, and alterations shall be based on the estimated
cost of construction including all structural, electrical,
plumbing, mechanical interior finish and site preparation
elements. The following table sets forth said fees:
|
Construction Cost |
Permit Fee + Plan
Review Fees below |
| $0.00 |
$8000.00 |
$75.00 |
| 8001.00 |
15,000.00 |
150.00 |
| 15,001.00 |
20,000.00 |
200.00 |
| 20,000.00 |
25,000.00 |
250.00 |
| 25,001.00 |
35,000.00 |
500.00 |
| 35,001.00 |
50,000.00 |
750.00 |
| 50,001.00 |
75,000.00 |
1,000.00 |
| 75,001.00 |
100,000.00 |
1,250.00 |
| 100,001.00 |
150,000.00 |
1,500.00 |
| 150,001.00 |
200,000.00 |
2,000.00 |
| OVER
200,000.00 |
2,500.00 + $10.00 per
additional $1,000.00 |
|
*The
City may from time to time, hire an independence
inspector to make inspections which cannot be
performed by the city staff. The cost of said
inspections shall be paid by the builder. |
Plan Review
Fees
Fees are accessed thru an outside professional
service |
| Single Family Residence
New |
$315.00 |
| Residential Additions |
215.00 |
| Detached Garage |
115.00 |
| Multi Family Residence |
315.00 per dwelling
unit |
| Basement remodel, deck,
shed, etc |
115.00 |
| Commercial, Office,
Industrial |
0.003 x construction
cost as determined by the most current publication
of the Means Cost Estimating Guide. |
| Elevators, Escalators,
Lifts, Etc... |
100.00 |
| Parking Lots |
100.00 |
| Sign Permits |
350.00 |
| Resubmittals |
65.00 each |
| Other Fees |
| Reinspection Fee: |
|
| First occurrence |
$80.00 |
| Subsequent occurrences |
100.00 |
| Work started without
permit |
2x standard fee |
| Final occupancy |
50.00 |
| Violation of Building
Code |
|
| First offence |
100.00 |
| Subsequent offense |
200.00 |
| Elevator inspection |
50.00 |
| Water Tap On |
Fees vary |
| Engineering fees |
All new construction
incurs engineering fees (fees vary)
New single family home - $500.00 minimum |
| Impact Fees |
All new residential
construction on empty lots – see table below. (Demo
& rebuild does not incur Darien impact fee. Does
incur county fee)
DuPage County Impact Fee – Must show proof of
payment prior to permit issue – Call 630-407-6882 |
| Impact Fees |
|
Detached Single-Family |
Attached Single-Family
(Townhome) |
|
3-bedroom |
4-bedroom |
2-bedroom |
3-bedroom |
| Park |
$2,735 |
$3,486 |
$1,739 |
$2,085 |
| Grade School |
1,775 |
2,667 |
268 |
724 |
| High School |
507 |
1,088 |
73 |
177 |
| Library |
121 |
141 |
93 |
114 |
| City |
125 |
125 |
125 |
125 |
| Total: |
$5,263 |
$7,507 |
$2,298 |
$3,225 |
Based on the estimated population table, estimated amount
of land required and $166,500 per acre of undeveloped land,
per the Subdivision Regulations, as amended April 2, 2007.
All new plats of subdivision submitted after April 2,
2007, are subject to the above impact fees, for newly
created residential lots.
|
 |